Town of Roxbury
NYCDEP New Infrastructure
Program
Wastewater Project
|
|


Preliminary Construction
of New Infrastructure Project, Roxbury, New York
|
|
This
project consists of construction of a new wastewater collection system and
pumping station for a community of 700 in the New York City Watershed.
Engineering services will be provided for all phases of the project as
follows:
|
|
|
-
Preliminary Engineering Reports
-
Final Design and Specifications
-
Bidding Assistance
-
Construction Administration
-
Construction Observation
|
|
The major components of the project include the following:
|
|
|
-
30,000 LF New 8” and 10” Collection Sewers
-
47,000 LF New 8” HDPE Force Main to Grand Gorge
WWTP
-
1,000 SF Pump Station Building
-
Chemical Storage and Feed System for Force Main
Odor Control
-
200,000 Gallon Pre-stressed Concrete Emergency
Storage Tank
-
80 KW Emergency Generator
-
Terminus Vault for Flowmetering and Backpressure
Sustaining Valves
|
|

|