Project
Descriptions
|
|
Town
of Lexington
Bushnellsville
Creek
Bridge
Replacement
Project
|
|

Bushnellsville
Creek Bridge, Lexington, New York
|
|
This project consisted of
preparing construction plans for the complete replacement of a Town Bridge over
the Bushnellsville Creek - A tributary to the New York City Reservoir system.
The project involved replacing a 60 - 65 year old wood deck bridge with a 26
foot span, heavy timber modular bridge system. The existing horizontal and
vertical alignments were adjusted to accommodate the modular system.
Engineering services were provided for the project as follows:
|
|
|
-
Topographic Survey
-
Preparation of Opinions of Costs
-
Preliminary Evaluation &
Design
-
Coordination with Town & Manufacture
-
Final Design and
Specifications
-
Coordination with NYSDEC & NYCDEP
-
Temporary Construction
Easements
-
Construction Administration & Observation
|
|
The
major components of the project included the following:
|
|
-
Site Survey
and Structural Assessment
-
Bank
Stabilization & Restoration
-
Design of
Abuttment(s)
-
Dewatering
and Water Quality Management
|
|

|